Construction Machinery
Quality control

Seven checks between the warehouse and your shipment

A documented sequence run on every order — because the most expensive part of a wrong shipment is the shipment you have to send back.

Quality control

Seven checks between the warehouse and your shipment

A documented sequence, run on every order. It exists because the most expensive part of a wrong shipment is the shipment you have to send back.

H-STAR engineers inspecting a part before shipment
  1. 01Product model verification
  2. 02Appearance inspection
  3. 03Port and mounting-position checking
  4. 04Dimension checking
  5. 05Nameplate and identification checking
  6. 06Functional or test-machine inspection where applicable
  7. 07Packaging inspection before shipment
Documentation

What we will send you before you pay

We do not publish badges we have not been given. What we can do is show you the actual unit and the actual paperwork for your order.

Measurement and inspection equipment used at H-STAR
  • Product photographs of the exact unit offered
  • Dimensional drawings where available
  • Packing list and packaging photographs before dispatch
  • Material or test documentation for the specific order, on request

Not sure of the part number?

Send a photograph of the nameplate, the machine model, or the old unit. We will identify what we can supply and quote it.